Always
On.

Power protection and critical electrical services for businesses that can't afford downtime.

Two Riello Sentryum UPS cabinets installed in a clean plant room

Everything between the grid and your servers.

We supply, install and look after the equipment that keeps critical systems running, and we do the electrical work around it.

Talk to an engineer
  • Battery sales and supply

    VRLA, AGM and lithium (LiFePO4) batteries, full battery testing, new bank installations and servicing of existing ones, with old cells removed for recycling.

    Get a price
  • UPS sales

    Single-phase 1 to 10 kVA and three-phase 10 to 120 kVA+ online systems, sized to your actual load after a site assessment.

    Get a price
  • UPS service and maintenance

    Maintenance contracts, repairs, battery replacements, load bank testing and emergency call-outs on all major brands.

    Book a service
  • Data centre and server room electrical

    Dedicated DBs, PDUs, earthing and bonding, N+1 and 2N redundancy planning, and power audits.

    Plan a project
  • Generator switchgear

    ATS and changeover panels, generator and UPS integration, synchronisation and switchgear maintenance.

    Plan a project
  • End-to-end cabling

    Power and structured data cabling, tray and trunking, labelling and certification, installed as one job.

    Plan a project

UPS maintenance plans with the SLA written down.

Most UPS failures start with the batteries, and load-shedding wears them out faster than the datasheet says. A scheduled visit finds the problem before an outage does. Every plan states its response time and visit schedule up front.

Essential

For SMEs and branch sites

Response time
Next business day
Scheduled visits
Once a year
  • Visual inspection and battery test
  • Voltage and conductance readings
  • Firmware check
  • Written condition report

Priority

For mid-size businesses

Response time
8 hours on site
Scheduled visits
Every 6 months
  • Everything in Essential
  • Full load test
  • Capacitor and fan inspection
  • Reduced labour rates on replacements

Critical

For data centres and sites that can't go down

Response time
4 hours on site, 24/7 line
Scheduled visits
Every 3 months
  • Everything in Priority
  • Remote UPS monitoring
  • Early warning on battery health
  • Spare parts held for your site

We service any brand, including systems we didn't install. Plans are priced on system size and visit frequency, and you can move up a tier at any time. Start with a free health check and a written report, with no obligation to sign.

Battery testing and replacement, done properly.

A VRLA bank is designed to last 3 to 5 years. With daily load-shedding it's often closer to 2 or 3, and it rarely warns you before it fails to hold the load.

  1. Free on-site battery auditString and block readings, terminals, temperature and ventilation, photographed as we go.
  2. Load test on your real loadA discharge test shows the runtime you actually have. If the bank still has life in it, we'll tell you.
  3. Replace with the load protectedPlanned window, maintenance bypass or a temporary bank, then torqued to spec and re-tested.
  4. Old bank removed and recycledCredited against your invoice and disposed of through a licensed recycler.

What you get in writing

  • Audit report with photographs
  • Before and after discharge test results
  • Make, model, batch and install date of the new cells
  • Torque and commissioning sign-off
  • Charger settings as found and as left
  • Disposal certificate for the old bank
  • A booked date for the next replacement

One call when the power matters.

Most outages aren't caused by one faulty part. They happen where the battery, the UPS, the switchgear and the cabling meet, which is why we look after all four.

We answer at 3am

A 24/7 emergency line staffed by technicians who can talk you through a fault before they arrive.

Certified technicians

Qualified electricians and UPS specialists, with certificates of compliance issued on every installation.

The whole power chain

From battery to switchgear to cabling, one team is responsible, so nothing falls between contractors.

Honest, brand-neutral advice

We recommend what suits your load and budget, and we'll tell you when a repair makes more sense than a replacement.

Don't wait for the next outage.

We'll inspect your UPS, batteries and changeover setup, and tell you where your weak points are. No cost, no obligation.

Book a free power risk assessment

Recent work

Discuss your site
Technician replacing cells in a UPS battery bank beside an APC UPS

UPS battery bank replacement

Battery replacement

Full string replacement on a large APC UPS, with old cells removed for recycling.

Team installing a new battery rack in a server room

New battery rack installation

Server room

New rack and battery string installed and connected to the site UPS.

Technician testing battery strings with a clamp meter

Battery testing and maintenance

Preventive maintenance

String-by-string testing to catch weak cells before they cause an outage.

Tell us about your site.

We'll come back with a quote, or a plan if the job needs a site visit first. For a system that's down right now, call the emergency line.

24/7 emergency line
+27 78 911 8003
Contact person
Eric
Office
Fourways, Johannesburg
Office hours
Mon to Fri, 08:00 to 17:00

We use your details only to reply to this request, in line with POPIA.